1. Part number / productFirst Article Builder
Price$49/mo flat per shop
StatusBeing built: not open yet
Guide

How to fill out AS9102 Form 3 (characteristic accountability)

Last checked 22 November 2026. Written from the published supplier instructions of three aerospace customers and two Rev B vs Rev C summaries (sources at the end). Not reviewed by SAE or IAQG.

Form 3 is the part of a first article inspection report (FAIR) where every design characteristic on the drawing gets one row: its number, where it is on the drawing, what the drawing asks for, and what you measured. This page explains each field in plain words, how to write results, what changes for a partial FAI, the mistakes customers' instructions warn about, and a worked example.

General information, not quality-system or contract advice. AS9102 is a paid SAE standard and we describe it from customers' published instructions, not from the standard's text: you need your own copy of AS9102. Your purchase order and your customer's supplier instructions decide what they accept; where they differ from this page, they win.

1

What Form 3 is

AS9102 (current edition: Revision C, published by SAE on 28 June 2023, per BSI's listing) sets the requirements for first article inspection in aerospace. A FAIR has three forms: Form 1 for part number accountability, Form 2 for materials, special processes and functional tests, and Form 3 for the design characteristics. A customer usually asks for it on the purchase order; L3Harris's supplier guide, for example, applies when an AS9102C First Article is required per the Purchase Order.

Form 3 only works next to a ballooned drawing: you put a numbered circle (a balloon, or "bubble") next to each characteristic, and each balloon becomes one Form 3 row. L3Harris asks for a ballooned document that gives a unique number to each design characteristic that is traceable to Form 3, Field 5. That includes notes, not just dimensions: PSEMC's instructions say All notes in the 'Notes Section' (including removed items) of the drawing must be 'bubbled'.

The blank forms come from IAQG, which lists them on its forms page (the older Rev B Form 3 we checked is a Word file on iaqg.org); the standard itself is sold by SAE and resellers. Check which revision of the form your customer wants: the field numbers below are Rev C's (L3Harris's AS9102C table; Net-Inspect's and DISCUS's Rev B vs Rev C summaries agree), and Rev B forms number the signature, date and comment fields differently.

2

Each field in plain words

Header (fields 1–4)

Part number, part name, serial number of the part you measured (if it has one), and your FAIR identifier (field 4; Rev B called it the FAIR number). Use the part number and name as they appear on the customer's drawing or purchase order. L3Harris doesn't accept a blank or N/A FAIR number: supplier shall assign a unique identifier.

Characteristic number and balloon (field 5)

The balloon number from the drawing, one per row, in order. If one note holds several requirements, each gets its own number: L3Harris asks for a unique identifier assigned for each characteristic within a note, with sub-balloons listed separately. If you need a second page, carry on with the numbers: GD-OTS's example says that if the first page ends at 27, the next starts at 28.

Reference location (field 6)

Where to find the characteristic: usually the drawing zone (the border letters and numbers, such as B3), with the sheet number on a multi-sheet drawing, or a model location or specification callout when the requirement isn't on a 2D drawing.

Characteristic designator (field 7)

A mark for characteristics the customer treats specially, such as key characteristics or critical items. Fill it only when the drawing or the customer flags the characteristic; L3Harris calls it conditionally required. Some customers use this column for something else: PSEMC asks for the kind of characteristic (Note 1, Note 2, Dimension, Angle, Weld), and GD-OTS's (pre-Rev C) training asks whether it is a diameter, flatness, straightness, true position, etc. Follow your customer's instructions.

Requirement (field 8)

The full requirement as the drawing states it, with its tolerance and units. GD-OTS: Under no circumstances should a dimension be listed without a tolerance unless the feature is a basic or geometric tolerance. If a dimension has no tolerance of its own, write the title block tolerance that governs it. For a note, write the note's number and what it requires (for example, the finish specification), not only "Note 4".

Results (field 9)

What you actually measured or found. See the next section for how to write variable and attribute results.

Designed or qualified tooling (field 10)

The ID of special tooling used to accept the characteristic: a dedicated fixture, a customer-issued or designed gauge, and (per L3Harris) an NC program used as the inspection method. Ordinary calipers and micrometers are not designed tooling; L3Harris itself asks for their gauge type and calibration ID here when no designed tooling is used, while GD-OTS lists generic equipment in the comments field. Customers differ again.

Nonconformance number (field 11)

If a result is out of tolerance, the number of the nonconformance report (NCR) you raised for it. GD-OTS: This becomes a mandatory field if the part has any nonconformances. L3Harris also expects NCRs to be closed when the FAIR is submitted.

Optional fields

In Rev C, field 12 is the optional comments field (L3Harris: Provide any supporting comments or information): use it for the measuring method (CMM, height gauge, pin gauge), the sample size, or how a bonus tolerance was applied. It is also where extra columns your customer asks for go. Comments are 12 because Rev C took the signature off Form 3 and renumbered the comments column from 14 to 12 (Net-Inspect, 30 June 2023; DISCUS, 21 November 2023). Rev B forms had signature in 12, date in 13 and comments in 14 (IAQG's Rev B Form 3, February 2020), and GD-OTS's older training uses that numbering too, so check which form version your customer sends.

Rev C Form 3 has no signature or date at all: the whole FAIR is signed once, on Form 1 (fields 20–23, FAIR verified by and reviewed/approved by, each with a date).

Blank cells: L3Harris says Fields not applicable shall be filled in as “N/A” to demonstrate the FAI has been completely reviewed by the Supplier. Blank fields are not permitted.

3

Writing results: variable vs attribute

Variable characteristics are measured on a scale (a diameter, a length, a position). L3Harris defines variable data as Quantitative measurements taken on a continuous scale. Write the number you measured, not "OK" or a tick:

  • Use the same number of decimal places as the drawing; PSEMC: Record results to the same number of decimal places as the drawing dimensions.
  • For a repeated feature (2X, 4X), either list each value or give the range. L3Harris: list each as individual values or list once with the minimum and maximum of measured values attained.
  • For a position that passes only with bonus tolerance, L3Harris wants the actual value plus the words Accept with Maximum Material Condition/Least Material Condition.

Attribute characteristics are only judged as conforming or not (L3Harris: go/no-go, accept/reject, pass/fail): a thread checked with a go/no-go gauge, a visual note such as "break sharp edges", a part marking. Here a word such as "Conforms" is the result; say how you checked it, and record the gauge ID where a qualified gauge was used. If the note offers alternatives (marking method 8 or 9, say), L3Harris asks you to state which one you used.

Reference dimensions (in parentheses on the drawing) may be left out under AS9102C paragraph 4.7.2, according to L3Harris; PSEMC asks for them to be ballooned. Basic dimensions (in a box) show the split clearly: PSEMC says do not balloon them, L3Harris says Basic dimensions shall have their variable data recorded on the FAI form 3. Ask your customer when their instructions don't say.

4

Partial and delta FAI

A full FAI covers every characteristic. A partial (also called delta) FAI covers only what changed since an approved FAI. L3Harris: a partial FAI Addresses only the changes from a previously approved FAI, provided that all other characteristics are produced by the original production processes approved. GD-OTS lists the usual triggers for a delta FAI: a design change, or a significant change in the method of manufacture such as tooling, processes, location, machine, NC program or sequence.

On Form 3, a partial FAI lists only the affected characteristics, still with their balloon numbers from the current drawing, so the reviewer can trace them. Form 1 records that it is partial, the reason and the baseline part number and revision it builds on (L3Harris makes the baseline part number required). After a rejected characteristic is fixed, GD-OTS describes a further delta FAI to verify that the dimensions or attributes that were previously rejected, now conform.

5

Mistakes customers' instructions warn about

  1. "Pass" or a tick for a measured dimension. Variable characteristics need the measured value (L3Harris field 9; GD-OTS: Actual results of the measurement should be listed in this section.). GroundControl's guide calls this one of the most common rejection causes.
  2. Requirement without its tolerance, or a dimension governed by the title block tolerance listed without it (GD-OTS field 8).
  3. Notes not ballooned, or several requirements in one note sharing one balloon (PSEMC; L3Harris 2.3.12.1).
  4. Blank cells instead of N/A (L3Harris 2.3.12).
  5. Out-of-tolerance result without an NCR number in field 11 (GD-OTS; L3Harris).
  6. Balloon count and Form 3 rows don't match, or numbering restarts on page 2 (GD-OTS field 5).
  7. Results with fewer decimals than the drawing (PSEMC).
  8. A key characteristic not flagged in field 7 when the drawing or customer marks it.

These come from the three customers' instructions and one vendor guide listed below, not from a survey of rejections; your customer may check other things.

6

Worked example

Made-up example

An invented part, not a real drawing or customer: bracket EX-1001 rev B, aluminium, one sheet. The drawing has a 2X hole Ø.250 +.005/-.000 in zone B2 marked as a key characteristic, a flatness of .002 on the base in zone C1, and note 3, "Break all sharp edges .010 max", in zone A3. Balloons 1, 2 and 3.

5 Char. no.6 Ref. loc.7 Designator8 Requirement9 Results10 Tooling11 NC no.12 Comments
1B2KC2X Ø.250 +.005/-.000.251, .252N/AN/APin gauges
2C1N/AFlatness .002.0011N/AN/ACMM
3A3N/ANote 3: break all sharp edges .010 maxConformsN/AN/AVisual, radius gauge

Why each row reads this way: row 1 is variable, so both holes get a measured value, with three decimals like the drawing, and "KC" stands for whatever key-characteristic mark your customer uses. Row 2 is variable too: the measured flatness, not "OK". Row 3 is an attribute note, so "Conforms" is the result and the comment says how it was checked. No designed tooling and no nonconformances, so N/A rather than blanks. Our own table layout, not the official form.

Had one hole measured .256 (over the .255 limit), the result would still be written as measured, with the NCR number in field 11.

7

About First Article Builder

We are building First Article Builder: you click each dimension on your drawing PDF to balloon it, and it starts the matching Form 3 row, with the drawing kept in your browser rather than uploaded. You type the results or import them from your CMM software's CSV export, and save Form 3 as an Excel file. It is not open yet: there is no sign-up and nothing to buy today. The plan is $49/month or $490/year flat per shop (plus VAT or sales tax where applicable) with a 14-day trial that needs no card; the front page has the details. Until then, a free Excel template of Forms 1–3 is available, no email needed.

Sources

Sources

  • L3Harris, QA-01.1.1 "Supplier First Article Inspection Requirements", effective 20 February 2024, version 1 (refers to AS9102C), PDF, read 22 November 2026.
  • General Dynamics OTS, "AS9102 First Article Training", Supplier Quality Assurance Team, January 2019 (written before Rev C), PDF, read 22 November 2026.
  • PSEMC, "AS9102 FAI instructions" (supplier process steps, marked "reference only"), PDF, read 22 November 2026.
  • GroundControl, "How to fill out AS9102 forms", article, read 22 November 2026 (paraphrased, not quoted).
  • SAE International, AS9102C, Aerospace Series: First Article Inspection Requirement (standard listing; the standard's text was not read for this page).
  • BSI Knowledge, SAE AS9102C:2023 listing (published 28 June 2023, publisher SAE), read 22 November 2026.
  • Net-Inspect, "AS9102 First Article Inspection Report Rev B vs Rev C", 30 June 2023, article, read 22 November 2026.
  • DISCUS Software, "AS9102 Rev C: what you need to know", 21 November 2023, article, read 22 November 2026 (paraphrased, not quoted).
  • IAQG, 9102 Form 3, Rev B (revision date February 2020), Word file, read 22 November 2026 (for the older field numbers only).
  • IAQG, standards forms page (AS9102 forms; the page blocks automated requests, so it was not opened for this guide).

General information, not a substitute for the standard or your customer's requirements; you need your own copy of AS9102. First Article Builder is not affiliated with or endorsed by SAE International or IAQG. Last checked 22 November 2026; customer instructions change, so read the current version your purchase order names.